Morphing Visualizations
You can morph a visualization by simply selecting the required resultant visualization from the available listing.
When used in combination with the copy and paste functionality, dashboards can be quickly created.
Steps:
1. On the Dashboard and Workbook Settings pane, click the Dashboard tab and then the button.
The Morph pane displays.
2. Select the visualization to morph from the drop-down list.
The list of visualizations is enabled.
3. Select another visualization on the list.
The visualization is changed to the new one.
NOTE |
When morphing between visualizations with the same variables, there is no further configuration required. For example, from a Horizontal Bar Graph to a Vertical Bar Graph. However, when morphing between visualizations with different variables, the new visualization will need to be configured to include columns for empty variables. For example, when converting from a Pie Chart to a Scatter Plot, the X and Y axis must be defined.
|