HyperWorks Batch Applications Unit Draw
HyperWorks applications can run interactively or in batch mode.
Unit Draw for BatchMesher in Batch Mode
BatchMesher Applications | AUs |
---|---|
1-8 | 21 |
9-16 | 40 |
17-32 | 50 |
33-64 | 60 |
65-128 | 70 |
129-256 | 80 |
257-512 | 90 |
>512 | 100 |
For example, 21 AUs are drawn when running up to 8 copies of BatchMesher in batch mode. If there are 9 copies of BatchMesher running, the total increases to 40 AUs.
Unit Draw for HyperWorks Application in Batch Mode
HyperWorks Batch Applications | AUs |
---|---|
1 | 21 |
2 | 42 |
3-4 | 50 |
5-8 | 50 |
9-16 | 60 |
17-32 | 70 |
33-64 | 80 |
65-128 | 90 |
129-256 | 100 |
257-512 | 110 |
>512 | 120 |
For example, when you launch HyperWorks in GUI mode, 21 AUs are drawn from the license pool. If you are on the same machine, also run a script to perform Geometry cleanup and report generation in batch mode. Even though the two batch applications require 42 AUs, the total units required for the entire process is 42 AUs due to the levelling mechanism.