Package Reports

Package the report directory, <studyDir>/rpt/…, in a .zip file.

The top level directory in a study is <studyDir>. Once an approach is created, a secondary subdirectory, <studyDir>/rpt, is created for reports. Each approach then has its own subdirectory within the rpt directory.

  1. From the menu bar, click File > Package Report.
    The HyperStudy - Select Location dialog opens.
  2. Navigate to your working directory.
  3. In the File name field, enter a name for the packaged report.
  4. Click Save.