Visualize Scatter Plots
Plot exploration inputs and outputs.
-
From the Design Explorer ribbon, Evaluate tool group, click the
Results Explorer tool.
The Results Explorer browser opens.
- In the Results Explorer browser, click the Scatter Plot icon .
- Select the desired X-axis value and the desired Y-axis value(s).
- Optional:
Select constraints to plot as datum lines.
Note: Checking Show Violated will color plot points red where corresponding runs violate the given constraint.
- Optional:
Check Optima.
This will display data points for only optimal runs. This can be useful when there are a large number of runs and also for multi-objective optimization explorations, which may have more than one optimal run.
-
Analyze the plot.
Each point in the plot corresponds to an individual run in the DOE. Selecting any plot point will highlight the corresponding run in the summary table.Tip: Creating constraints for DOE explorations can be useful, as they can be selected and plotted as datum lines on a scatter plot. This can be a good visualization tool to see which runs in the DOE violate constraints and which are potentially feasible designs.